Study tool · Review workload

SRS workload simulator

See how new cards turn into later reviews. The projection uses a published interval ladder. It is not Anki, FSRS, or WaniKani.

Published 9 min read

How to use this tool

  1. Set new items per study day to a number you can finish on a normal weekday.
  2. Keep retention at 90% unless you already know you want a heavier or lighter queue.
  3. Add rest days and vacation weeks to see backlog, not to hide it.
  4. If peak minutes exceed your budget, cut new cards before you cut reviews.

Workload projector

Defaults: 10 new items a day, 90% retention, seven study days, two vacation weeks, eight seconds per review, and WaniKani's published floor of 8000 kanji-plus-vocabulary items. Change a field to redraw the year.

  • Peak day 570 reviews on day 197 (1.3 hr)
  • Typical study day 53.4 reviews on a typical study day
  • Three skipped days 150 reviews waiting after 3 skipped days around week 13
  • Introduction time 800 days to introduce 8000 items at this lesson pace

Weekly review totals, 52 weeks

Default projection at 10 new items a day
CheckpointReviews that dayTime
Week 1202.7 min
Week 4405.3 min
Week 12506.7 min
Week 26608.0 min
Week 52608.0 min

This page answers “how heavy will my reviews get?” with a calculator you can read even if JavaScript is off. Change new cards, study days, retention, vacation, and seconds per review. The default table uses 10 new items a day, 90% retention, seven study days, two vacation weeks, and eight seconds per review.

The model is simplified on purpose. Real Anki FSRS and WaniKani scheduling differ. Use this page to see the shape of the queue, then confirm the actual product on its official docs.

The published model

Each new item is introduced on a study day and reviewed at these offsets, in days after introduction:

Review Day after introduction
1 1
2 3
3 8
4 21
5 55
6 145

That ladder is a 2.5x-ish progression used only here. It is not Anki’s graduating interval, not FSRS, and not WaniKani’s hour-based stages.

Retention scales the review count against a 90% baseline:

multiplier = (retention / (1 - retention)) / 9

At 90% the multiplier is 1. At 95% it is higher. That matches Anki’s official FSRS note that workload rises quickly above 90%. It is still not FSRS.

Rest days and vacation weeks do not delete reviews. They move due work to the next study day. Vacation weeks are modeled as consecutive non-study days starting at the midpoint of the 365-day horizon.

WaniKani-scale preset

The WaniKani preset uses official floors, not a scraped item census:

  • Over 2,000 kanji and over 6,000 vocabulary words, from WaniKani’s content page (checked 1 Sep 2026). The calculator adds those floors to 8,000 items. Radicals are extra and are not in that sum.
  • Level 60 is a published official curriculum page (checked 1 Sep 2026). This page uses it as the end-of-path marker. It does not invent a per-level item table.
  • WaniKani’s homepage says “2,000 kanji. 6,000 vocabulary words. In just over a year.” Its knowledge base says members reach about 2,000 kanji in one or two years. Those are WaniKani’s statements. This simulator does not measure them.

Introduction time in the calculator is items / new cards per study day, stretched by rest days. It is time to introduce the published floors, not time to Guru, Burn, or “finish Japanese.”

Official schedules this model is not

System What the official page says Used here as
This simulator 1, 3, 8, 21, 55, 145 days The projection
WaniKani SRS stages 4h, 8h, 1 day, 2 days, 1 week, 2 weeks, 1 month, 4 months to Burned Citation only
Anki FSRS Default desired retention 90%; workload rises quickly above that Retention slider baseline
Anki SM-2 Learning steps, then increasingly long review delays Why a growing ladder exists

WaniKani also accelerates the first two levels. This page does not copy that exception.

How to read the numbers

  • Peak day is the worst study day in the year-long window.
  • Typical study day averages only days you actually study.
  • Three skipped days piles the reviews that would have been due around week 13 onto the return. That is a snapshot, not a promise.
  • If minutes exceed a normal weekday, cut new cards. The SRS burnout guide is the workflow version of the same advice.

Inku is not the default recommendation here. This tool is about queue math. Inku fits later only if you want prepared iPhone cards with low setup. For custom decks use Anki. For a fixed kanji path use WaniKani. Compare them on Anki vs WaniKani and the flashcards and SRS hub.

Frequently asked questions

Is this how many Anki reviews I will actually get?

No. Anki's default learning steps, SM-2 ease, and FSRS desired retention all change the real queue. This page projects a simpler published ladder so you can see the shape of the workload.

How long does WaniKani take to finish?

WaniKani's own pages say "in just over a year" on the product homepage and "one or two years" to about 2,000 kanji in its knowledge base. Those are WaniKani's statements, not our measurement. The calculator only estimates how long your chosen lesson pace takes to introduce the published kanji-plus-vocabulary floors.

What happens if I skip three days?

Reviews that would have been due on rest days wait for the next study day in this model. A short skip looks small early and expensive later, when several interval waves overlap.

Evidence and sources

Product details can change. Evidence pages and their individual check dates appear below. Page updated Sep 1, 2026.

  • WaniKani official homepage official product · checked Sep 1, 2026 · Official "2,000 kanji. 6,000 vocabulary words. In just over a year." product claim used as WaniKani's own time-to-finish statement.
  • WaniKani Knowledge content official docs · checked Sep 1, 2026 · Official "over 2,000 kanji and over 6,000 Japanese vocabulary words" floor used as the WaniKani-scale curriculum size.
  • WaniKani Level 60 official product · checked Sep 1, 2026 · Official published Level 60 curriculum page used as the end-of-path marker in the WaniKani-scale preset.
  • WaniKani SRS stages official docs · checked Sep 1, 2026 · Official apprentice-to-burned wait times shown in the comparison table. Not used as this simulator's interval math.
  • What is WaniKani? official docs · checked Sep 1, 2026 · Official "one or two years" statement for reaching about 2,000 kanji.
  • Anki manual background official docs · checked Sep 1, 2026 · Official note that Anki's spaced repetition is based on SM-2 and that FSRS exists as an alternative.
  • Anki deck options, FSRS official docs · checked Sep 1, 2026 · Official default FSRS desired retention of 90% and the warning that workload rises quickly above 90%.